Electro-mechanical supply sought for Tri An expansion in Vietnam

Power Project Management Board No.3 of EVN, Vietnam’s state power producer and supplier, invites bids by 18 July for the supply of electro-mechanical equipment for the expansion of the 400 MW Tri An hydropower plant. EVN is expanding the existing storage plant, which is located on the river Dong Nai in southern Vietnam, with the addition of a 200 MW unit. Tri An is the last hydropower dam of a cascade before the river flows through Ho Chi Minh City, which is located about 70 km south-west.

The scope of supply under this package shall include the design, manufacture, factory-testing, transportation and delivery of the equipment to the construction site, as well as supervision of installation, testing and commissioning of equipment, according to a tender notice published on the website of GTAI.

Furthermore, the scope shall cover the supervision of testing and commissioning, handing over and guarantee of the material and equipment n accordance with the contract; andthe performance of all services required for the design, the manufacture of the equipment and the installation, completion and commissioning of the facilities in accordance with the plans, procedures, specifications, drawings, standards, codes and any other documents as specified in the technical specifications.

The procurement notice can be viewed at: https://www.gtai.de/en/trade/viet-nam/tenders/supply-of-electro-mechanical-equipment–1903600.

A complete set of bidding documents is available to interested bidders on the website of the Vietnam National Electronic Procurement System (VNEPS) at: https://muasamcong.mpi.gov.vn.