Tailor-made generators manufacturers
Tailor-made generators manufacturers

Consulting services sought for detailed design of dam for Sisneri Water Supply Project in Nepal

The Kathmandu Valley Water Supply Management Board (KVWSMB) invites expressions of interest from eligible consulting firms by 8 October to provide detailed engineering design of a fam and its ancillary components for the Sisneri Water Supply Project. The consulting services will be financed by a grant from the World Bank to the Government of Nepal toward the preparation and implementation of the Kathmandu Valley Water Security Improvement Project (KV WaSIP).

Consulting services include detailed engineering design, preparation of estimates, economic/financial feasibility assessment and preparation of procurement documents required for effective implementation of the dam and its ancillary components. A total of 144 person-months for experts is estimated and the assignment is expected to commence in January 2027 with the implementation period of 14 months. The detailed Terms of Reference (TOR) can be found at the following website: www.kvwsmb.org.np.

Interested consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the services. Consultants should have with at least five years of experience in dam engineering, water resources, civil engineering, hydropower, water supply, hydraulic infrastructure, or related fields, and at least ten years of experience in detailed engineering design of concrete/RCC/CFRD dams with a minimum height of 35 m; as well as construction supervision, construction management, or detailed design review of major dams; and dam or major water-resources infrastructure projects outside the consultant’s home country.

A consultant will be selected in accordance with the Quality and Cost Based Selection (QCBS) method as set out in the World Bank’s “Procurement Regulations for IPF Borrowers”, Seventh Edition (September 2025).

Expressions of interest must be delivered in a written form to the address below (in person, by mail or by e-mail) by 14.00 hours on 8 October 2026.

For further information, contact: Dol Prasad Chapagain, Executive Director, Kathmandu Valley Water Security Improvement Project – Sisneri Water Supply Project, Kathmandu Valley Water Supply Management Board (KVWSMB), Sainbu, Bhaisepati, Jawlakhel, Lalitpur; Mobile.: +977 9851042773 E-mail: sisnerikvwsmb@gmail.com; Website: www.kvwsmb.org.np.

Tailor-made generators manufacturers
Tailor-made generators manufacturers