Located in Mandiana Prefecture in the Kankan administrative region, on the river Sankarani in the Niger watershed, the Morisananko site has an estimated potential of 100 MW. The dam site is 65 km from the 225 kV Guinea-Mali interconnection line, which is under construction. The Grand Kinkon site is located in Pita Prefecture on the river Kokoulo River, 10.5 km downstream from the Kinkon hydropower plant in the Konkouré watershed. It has an estimated potential of 291 MW.
Both projects are planned to be developed on a Public Private Partnership (PPPs) basis. The technical, economic and financial studies and environmental and social impact studies of the two projects are to be financed from a loan provided by the African Bank of Development (AfDB).
The services of the consultants who will be recruited for the two projects will cover at least (i) Feasibility studies of the hydroelectric development of Morisananko and Grand Kinkon (Phase 1), Studies of legal, financial and commercial structuring of the projects (Phase 2), and Preparation of transactional documents to allow the selection of the private partner(s) (Phase 3). The main objective of these studies are to develop all the requisite documents with a view to the realization of the Morisananko and Grand Kinkon hydropower plants, according to a scheme of legal and financial structuring in a public-private partnership (PPP). The whole study requires that a particular emphasis be placed on gender mainstreaming in order that women benefit from the benefits of projects as providers (opportunities employment), users (use of electricity services), and stakeholders (consultation in different steps).
The two contracts are scheduled for a maximum of 14 months, with a start date envisaged in July 2026.
The full scope of services is detailed in the Terms of Reference, which are available from the employer.
Interested consultants must provide information demonstrating their ability and experience to carry out the requested services including references of similar assignments. Consultants may form joint ventures to increase their chances of qualification. The eligibility criteria, the establishment of the shortlist and the selection procedure will comply with the Contracting Policy for Group-Funded Operations of the AfDB, October 2015 edition, which is available at http://www.afdb.org. The procurement process will be conducted in accordance with the Quality and Cost Based Selection (QCBS) method.
Expressions of interest in French must be submitted by e-mail to the below-mentioned address and marked “À l’attention de Monsieur le Coordonnateur du Projet” no later than 11 am (local time) on 24 November for the Morisananko hydropower project with the subject «La réalisation des études de faisabilité technique, économique et financière, environnementale et sociale de la centrale hydroélectrique de Morisananko» and by 11 am on 1 December for the Grand Kinkon scheme with the subject «La réalisation des études de faisabilité technique, économique et financière, environnementale et sociale de la centrale hydroélectrique de Grand Kinkon». For further information contact Monsieur le Coordonnateur du Projet, Quartier Almamya, Rue KA 050, Immeuble KATEX, 3e étage, près du siège de Cellcom-Guinée, Conakry; Tel.: +224 622 089610; E-mail: bangaly.konate@paaeg.com; djombo.coumbassa@paaeg.com; from 8 am to 5 pm Monday to Thursday and 8 am to 1 pm on Fridays.