Expressions of interest are invited by 26 March from qualified individual consultants for the roles of Dam Engineering Expert and Chair of the Panel of Experts, Geotechnical Engineering Expert and Hydrology/hydraulics Expert. Funding for the work of the DSPOE is being provided by the World Bank’s International Bank for Reconstruction and Development (IBRD) within the framework of the Lebanon Renewable Energy and System Reinforcement Project.
The general task of the panel is to review all relevant design, engineering, construction and dam safety aspects. The members of DSPOE will be selected by the client based on the required skill-mix. The members will constitute a group of high-level, internationally-recognized professionals. The individual experts will be directly contracted by the LRA on a needs-driven basis in accordance with the Terms of Reference (TOR), according to a tender notice published on the World Bank’s procurement website on 10 February. The assignment for each of the three experts is expected to cover the entire project implementation period, estimated at three years. Details for the Scope of Work and for Experience and Qualifications Requirements for each of the three experts can be viewed at https://projects.worldbank.org/en/projects-operations.
The Qaraoun dam, which is also known as the Albert Naccache dam, impounds Lake Qaraoun, the largest artificial lake in Lebanon, located in the middle reaches of the river Litani. The 61 m-high concrete-faced rockfill dam, which was completed in 1959, is a multipurpose structure, which regulates water supply for hydropower generation, domestic water supply, and irrigation. Lake Qaraoun has a surface area of 11.09 km2 with a total capacity of about 220 x 106 m3 and effective/live storage of 160 x 106 m3. It regulates water supply for four hydroelectric power plants with a total capacity of 195 MW.
The attention of interested consultants is drawn to Section III, paragraphs 3.13, 3.15, and 3.16 of the World Bank’s Procurement Regulations for IPF Borrowers (February 2025), which set forth the World Bank’s policy on conflict of interest. A consultant will be selected in accordance with the Individual Consultant Selection method set out in the Procurement Regulations (World Bank’s Procurement Regulations for IPF Borrowers (Feb. 2025).
Interested individual consultants should submit their Expression of Interest including:
- CV demonstrating relevant experience and qualifications;
- cover letter outlining suitability for the assignment, and,
- at least three references with contact details.
Expressions of interest must be delivered in written form in person or by e-mail no later than 10:00 a.m. (Beirut Time) on 26 March, to the address below.
For further information, contact: Mrs. Grace Ammoury, Head of Procurement Department, Litani River Authority, Ghannageh Building, 4th floor, Bechara El Khoury Street, Beirut, Lebanon; Tel.: +961-1-662118; Fax: 961-1-660476; E-mail: gammoury@litani.gov.lb